The Principal (Hurunui District Council) is looking for a suitably qualified Contractor to undertake the construction of a sewer main in the township of Cheviot. This work is to install new sewer main including new manholes, and replacement of existing sewer main while retaining existing manholes. The main tasks involved in this Contract are: - Construction of 265m of new DN225 uPVC - Construction of 365m of new DN150 uPVC - Construction of eight 1050mm Manholes The sewer line to be installed is approximately 630m, comprised of 365m of DN150 uPVC and 265m of DN225 uPVC. Starting from Reeves Street on the western side of SH1 from wastewater manhole (WWM) 363, the pipeline will replace existing asbestos concrete pipe with DN225 uPVC between manholes leading up to WWM365 and to connect to a new manhole immediately prior to SH1. Across SH1 at WWM368, existing concrete pipe will be replaced up to WWM372. Entering Hutchinson Street, DN150 uPVC will be laid from WWM372 with no existing pipeline. Alignment continues north to McQueens Road before terminating into existing WWM374. A new manhole will be installed inline existing pipeline at the start of Caverhill Road, extending north until it terminates at WWM352. Pipe capping will be made downstream of WWM352 and WWM374. A provisional scope of works for installing 35m of DN225 uPVC across SH1 is included in schedule of quantities. The Contractor is to supply all pipe, manholes, fittings, connections and to perform all required pipe inspection and testing. The Contractor will also be responsible for all health, safety and environmental aspects of the project. The Contractor will be responsible for the reinstatement of all surfaces to the same or better condition.
Deadline
16.12.2025
Published
18.12.2025
Awarded
18.12.2025
CON640/822: Maraetai Road Stormwater Improvements
Open for bids·Oct 21
Tayler Street Wastewater Pipe Renewal (Eltham)
Closed·Sep 6
Ardwick Street Wastewater Renewal
Closed·Aug 21
Contract 920 Waste and Water Main Renewals, Clyde St (SH1), Balclutha
Closed·Aug 13
Erewhon Rural Water Scheme Pipe Renewals 2026-29
Closed·Aug 3
Hunter Street Water Supply Pipe Renewal
Closed·Jul 27
Main Contractor for Block E (Music Suite) Roof & Wall Recladding at Maruawai College
Open for bids·Nov 1
Main Contractor for Roofing Refurbishment at Avalon School (Wellington)
Open for bids·Nov 1
Notice of Information - Napier City Council Tender Dates Over Holiday Season
Open for bids·Nov 1
Howick Fire Station
Open for bids·Nov 1
SCI_2600812 High Stage Rating Curve Modelling
Open for bids·Nov 1
Kelburn Viaduct Safety Screens
Open for bids·Nov 1
Create an account to explore this tender and find similar opportunities.