Loading Otnox...
Otnox
GTGuatemala·Buyer: MUNICIPALIDAD DE EL TEJAR, CHIMALTENANGO

Construccion Muro De Contencion Calle Alterna Hacia Colonia Monterrey Mendez El Tejar, Chimaltenango

Open for bids·10 Sep 2026

TRABAJOS PRELIMINARES + REPLANTEO TOPOGRAFICO · COLUMNAS C-1: 0.20m*0.20m, 4 No. 4 corridos + Est. No 2 @ 0.15m, Concreto F´C= 210 kg/cm2 · LEVANTADO DE BLOCK: 0.19m*0.19m*0.39m CLASE A · CIMIENTO CORRIDO CC-1: 1.00m*0.25 (Ref.No.4 @ 0.15 en ambos sentidos) + DADO (0.25m x 0.25m, 6 No. 4 corridos +Est. No. 3 @ 0.15m, Concreto F´C= 210 kg/cm2 · TENSOR : Dado 0.40m*0.40 (Ref.No. 4 @0.10 en ambos sentidos + Brazo 0.20*0.20 (Ref. 4 No. 4 corridos + Est. No. 2 @ 0.15m), Concreto F´C= 210 kg/cm2 · SOLERAS (Hidrofuga, Intermedia, Corona) 0.20*0.20, 4 No. 4 corridos + Est. No. 2 @ 0.15 mts, Concreto F´C= 210 kg/cm2

Published

10.09.2026

Open for bids

10.09.2026

© 2026 SIA «Vietne». All rights reserved.