NLNetherlands·Buyer: Ministerie van Economische Zaken

Benthic Survey of the Doordewind Wind Farm Zone

Open for bids·10 Aug 2026

The Dutch government has drawn up a road map for the development of offshore wind farms. The current goal for total capacity of offshore wind energy is 23 GW. Wind Farm Zone 6/7 is expected to be included in a next iteration of the offshore wind energy road map. In this context, the Netherlands Enterprise Agency has been tasked with providing site data for future wind farms in the Wind Farm Zones and commissions a Benthic Survey. The overall objective of the benthic survey is to collect factual benthic data to test the findings of a desktop study on reef detection in the DDW WFZ (results expected in July, 2026), and to establish a baseline measurement of the benthic environment in the area.

Published

10.08.2026

Open for bids

10.08.2026

Deadline

01.10.2026