BBV are required to alter the position of the hydraulic ramp for their Wolseley Drive re-alignment scope. The Suppliers scope involves the following: - The disconnection of all mechanical and electrical equipment The removal of the existing unit The installation of the existing unit The connection of all mechanical and electrical equipment BBV will assist with the works via: - The excavation of the ground to create the new pit Any in-situ concrete works Any backfill works Management of stakeholders The supplier is also to consider the potential for a new hydraulic ramp system to be designed and installed and offer their ability and express their willingness to do so. Additional information: Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of work, prior to completing this expression of interest (EOI).
Published
16.02.2026
Aktīvs
16.02.2026
Deadline
25.02.2026
BBV HS2 MWCC North - Architectural Construction Works - Buildings
BBV Sublot 4 - HSST1020 - Cut & Bent Steel Reinforcement - Curzon Approach Viaducts
BBV Sublot 4 - HSST1020 - Deck realignment and jacking operation
BBV HS2 MWCC North - Project Wide Noise Barrier Acoustic Doors (Supply Only)
BBV HS2 MWCC North - Project Wide Utilities Works
BBV Delta Junction - HSST1040 Deck Subsurface Drainage
Procurement of office and IT equipment
T0345 - Dry Dock & Repair of Lightvessel 06
T0345 - Dry Dock & Repair of Lightfloat 03
T0345 - Dry Dock & Repair of Lightvessel 07
Provision of External Legal Panel Support for Patrick Finucane Inquiry
Face to Face Translation Services Contract
© 2026 SIA «Vietne». All rights reserved.