Deck realignment and jacking operation Tender There is a requirement to lower various bridge assets into please along the Curzon approach and a tender will be required to run for a short period to be able to meet the various key dates of the lowering of the bridge. While a scope of works is being put together the following are the basic requirements. o Provide a detailed temporary works Design for all equipment required to be used o Main scope: supply of the realignment and jacking system, and technical assistance for the operation on site with BBV self-delivering the works o As an option the supply of manpower and supervision to carry out the works in addition, including the bearing installation. Additional information: Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of work, prior to completing this expression of interest (EOI).
Published
24.03.2026
Aktīvs
24.03.2026
Deadline
31.03.2026
BBV HS2 MWCC North - Architectural Construction Works - Buildings
Active
BBV Sublot 4 - HSST1020 - Cut & Bent Steel Reinforcement - Curzon Approach Viaducts
Active
BBV HS2 MWCC North - Project Wide Noise Barrier Acoustic Doors (Supply Only)
Active
BBV Sublot 4 - HSST1020 - WWH Hydraulic Ramp reposition
Active
BBV HS2 MWCC North - Project Wide Utilities Works
Active
BBV Delta Junction - HSST1040 Deck Subsurface Drainage
Active
© 2026 SIA «Vietne». All rights reserved.