Primary Survey Control required on the A66 Scheme 3a.
Published
12.05.2026
Aktīvs
12.05.2026
Deadline
15.05.2026
A66 - Scheme 3A - Penrith to Temple Sowerby - Facilities Management
Closed·May 15
A66 - Scheme 3A - Penrith to Temple Sowerby - Haul Road Construction
Closed·May 12
A66 - Scheme 3A - Penrith to Temple Sowerby - Compound Construction
Closed·May 12
A66 - Scheme 3A - Penrith to Temple Sowerby - Dewatering
Closed·May 12
A66 - Scheme 3A - Penrith to Temple Sowerby - Culvert Installation
Closed·May 12
A66 - Scheme 3A - Penrith to Temple Sowerby - Drainage
Closed·May 12
WCC - Dynamic Purchasing System (DPS) for Road Traffic Surveys Q2 2026
Awarded·Oct 26
Kier Infrastructure - Engineering Bridge Structural Survey
Closed·Sep 16
Stock Condition Surveys (Commercial and Educational Buildings)
Awarded·Jul 31
WCC - Dynamic Purchasing System (DPS) for Road Traffic Surveys Q1 2026
Awarded·Jul 23
CA18150 - Area Measurement Reports
Awarded·Jul 23
ENQ1301 - CYP 2026/27 Condition Surveys
Awarded·Jun 26
2026-10-28 09:00 - QSB467 Ipswich to Pushforward Secondary (various locations in Ipswich, Stowmarket & Bury St Edmunds) - AWARD
Awarded·Oct 31
March 2027 Bus Contracts
Awarded·Oct 31
Infrastructure Connection Design Support - Pathology Lab
Awarded·Oct 30
Provision of Pre-Paid Cards
Awarded·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Awarded·Oct 30
Business Travel Services
Awarded·Oct 30
Create an account to explore this tender and find similar opportunities.