Loading Otnox...
Otnox
UKUnited Kingdom·Buyer: Kier Infrastructure

Kier Infrastructure - Engineering Bridge Structural Survey

Open for bids·16 Sep 2026·GBP 100,000

Kier Infrastructure is seeking to establish a dedicated supply chain to deliver a programme of both non intrusive and intrusive surveys in support of the design development and Environmental Impact Assessment (EIA) requirements for one of our contracts. The work scope requires the completion of structural surveys on bridges spanning roads and existing rail assets. Instructed work may include visual and dimensional surveys of assets, ground-breaking activities associated such as foundation pitting and trenching , masonry coring as well as 3D mapping of assets.

Published

16.09.2026

Open for bids

16.09.2026

Deadline

22.09.2026

© 2026 SIA «Vietne». All rights reserved.