The objective of this activity is to carry out the detailed design and manufacturing of a subassembly for the EU-Horizon 2050 funded project PANDORA (OPEN FAN VALIDATION FOR CARBON-FREE AIRCRAFTS | PANDORA | Projekt | Informationsblatt | HORIZON | CORDIS | Europäische Kommission) Open Fan Wind Tunnel Mode Test Article, whose preliminary design has been carried out by the PANDORA consortium. The status of the design is deemed to be mature enough to proceed to the detailed design phase. The preliminary aerodynamic shape of the rotor is frozen but during the detailed design phase interactions with the subcontractor are expected to ease the detailed mechanical design alleviating stress concentration in selected features of the rotor to maximise rotor life. The rig is expected to operate in two different facilities. The first installation is a low-speed wind tunnel operating at atmospheric conditions. Maximum Mach number is expected to be around 0.25. The second facility is a high-speed wind tunnel opera ng at sub-ambient conditions and a maximum Mach number of around 0.8 The expected outer and inner radii of the rotor are approximately 300 mm and 100 mm, respectively, and thus the blade height is approximately 200 mm. The number of rotor blades has been fixed to 12. The es mated maximum speed is about 7,700 rpm. The rotor is expected to feature a variable pitch mechanism that will be manually actuated at rest. The subcontractor, as responsible of all the rotating parts, will also design and manufacture a device to measure the pitch setting of all the blades before the rig opera on. The contractor will not use Level 2 subcontractors for critical components (most notably the Rotating Sha Balance), but will only utilize subcontractors for small parts or accessories. In the event of any doubts, the contractor will submit proposals in the ROM. DLR will request on-site support to operate the Rotating Shaft Balance during three weeks of testing. In summary, the objective of this contract is to carry out the detailed design of an open rotor prototype, its manufacturing, and the development and integration of a system that allows for the measurement of the three components of rotor forces and moments, namely a Roating Shaft Balance (RSB). The deliverables will include the hardware, analysis models, and a CAD representation of the prototype.
Veröffentlicht
14.08.2026
Offen für Angebote
14.08.2026
Bedingungen aktualisiert
14.08.2026
Frist
14.09.2026
Sonderanfertigung Motoren für den Aufbau von Bert-Robotern
Zuschlag erteilt·Oct 26
Erneuerung Seitenkühler G.121 R.033b
Offen für Angebote·Oct 24
Bereederung der seegängigen Technologieplattform MODULARIS
Offen für Angebote·Oct 22
Vektornetzwerkanalysators (VNA)
Zuschlag erteilt·Oct 22
Dampfverdichtungssystem in Containerbauweise
Offen für Angebote·Oct 21
Bereitstellung von Jamming- und Spoofing-Daten
Zuschlag erteilt·Oct 21
Markterkundung zur GMP-Herstellung eines Multi-Peptid-Prüfpräparats (IMP) für eine klinische Phase-I-Studie
Planung·Oct 13
Framework Contract ASDEX Upgrade diagnostics development and long term support
Offen für Angebote·Oct 9
Untersuchungen an bestrahlten Leichtwasser-Brennstäben aus dem Leistungsbetrieb von Kernkraftwerken.
Zuschlag erteilt·Mar 2
Markterkundung - Validierungsprojekt Nanoporöse Membrane
Planung·Jan 14
Gyrotrontest
Zuschlag erteilt·Jan 12
Studie techn. Machbarkeit/Lastenheft Bewegungssysteme im Forsteinsatz
Geschlossen·Nov 19
Neue Waldorfschule Dresden, Neubau BA 3 Oberstufenhaus - Los 43 - Stark- und Schwachstrom
Offen für Angebote·Oct 29
Monitoring Lausitzer Neiße - Polnische Seite
Zuschlag erteilt·Oct 29
Kauf fabrikneuer Beladung für Feuerwehrfahrzeuge
Offen für Angebote·Oct 29
Rahmenvereinbarung über die Lieferung von KFZ-Ersatzteilen und Verbrauchsmaterial (Kopie)
Offen für Angebote·Oct 29
1885-NA-D-LBO Planning Client
Zuschlag erteilt·Oct 29
Hanau, Am Hauptbahnhof 1, Sanitär- und Heizungsarbeiten
Offen für Angebote·Oct 29
Erstellen Sie ein Konto, um diese Ausschreibung zu prüfen und ähnliche Möglichkeiten zu finden.