A large rain event occurred in Southland in September 2023. This led to surface flooding across the region. Southland District Council (SDC) received complaints of surface flooding from several residents in Winton township. A stormwater upgrade was completed on Arthur Street in 2024. WSP have previously undertaken a stormwater model build for the township of Winton with several recommended upgrades and locations to investigate further. Based on this, water flooding concerns on Waterford Drive to be addressed by construction of new stormwater main draining to open channel on the west. SDC propose to upgrade the stormwater network by construction of an additional stormwater main on Waterford Drive to reduce the flooding experienced in this area in future events. The upgrade would be from the outlet drain on Ivy Russell Reserve on the western side of 48 Hillary Street to Niddry Crescent Waterford Drive Intersection.
Imechapishwa
16.08.2026
Wazi kwa zabuni
16.08.2026
Mwisho wa muda
25.09.2026
Huntly West Domain Courts Renewal
Blue-Green Network Plan & Supporting Implementation Guidance
327349 - Lift Replacement in MSB and G Block
Southland Hospital MSB5 Ring Main Unit Replacement
NZQA | Office Relocation Services
Tokomaru Bay Landfill - Temporary Transfer Station Facility
© 2026 SIA «Vietne». Haki zote zimehifadhiwa.