The project consists of design, construction, supply, installation and reinstatement works and siteworks which includes but are not limited to: • Development of the design documentation and building consent application. • Submission and management of building consent. • Demolition of the existing toilet, including debris removal and disposal to an approved dump site, and reinstatement of affected surrounding areas. • Supply, install and delivery of a new two pan turnkey concrete toilet block. • Installation of new power, water through new water tank, sewer and stormwater service connections. • Level the ground beside the toilet and extend the stormwater manhole riser to match. Add a drainage opening in the riser for playground runoff and fit a dome grate over the manhole inlet.
Imechapishwa
03.09.2026
Wazi kwa zabuni
03.09.2026
Mwisho wa muda
09.10.2026
Fleet Maintenance and Repair - Central Lakes
Morrinsville School - Blocks A, C, D, FA (Board), H, J, L, N - Roofing Works
Non-Teaching Staff PLD Panel - Neurodiversity
RFT - Whakatane High School - 5YA Blocks B, G and H Remediation Works
Main Building Contractor for Stage 2 of the Learning Support Fencing project at Waiopehu College
Registration of Interest - Main Contractor for Block 19 (Full) & Block 24, 25 (Partial) Cladding Replacement at St Albans School
© 2026 SIA «Vietne». Haki zote zimehifadhiwa.