The Ōhineangaanga Stream Erosion Protection Works project involves the construction of a range of river and stream management measures designed to stabilise stream banks, reduce erosion, protect surrounding infrastructure, and improve the long-term resilience and environmental health of the stream corridor. The works include the excavation and reshaping of sections of the stream channel and banks, installation of rock riprap erosion protection, construction of retaining structures including sheet pile walls and reinforced earth walls, and the implementation of grade control and flow management features to help manage water movement and reduce further erosion. The project also includes the creation of low-flow channel features and access benches to support both stream function and ongoing maintenance activities. Environmental management is a key component of the project. Works will be undertaken within and around the stream environment, requiring the management of stream flows, protection of aquatic habitats, and maintenance of fish passage during construction. Following construction, disturbed areas will be reinstated and riparian planting undertaken to enhance ecological values and support the long-term stability of the stream banks. Overall, the project is intended to provide a sustainable erosion protection solution that safeguards nearby assets, enhances the resilience of the stream system, and delivers environmental improvements within the Ōhineangaanga Stream catchment.
Publicat
20.08.2026
Deschisă pentru oferte
20.08.2026
Termen-limită
18.09.2026
Ohineangaanga Stream Remediation Work / Erosion Repairs
CON001926 - Whakatane Project Future Proof - Stage 4A
Contract 922 Reseal Professional Services
Advance Notice for Lower Piako River Right Bank Pipiroa to Ngatea Stopbank Upgrade Stages 2, 3 and 4
Advance Notice for Island Block Pump Station Upgrade Project - Construction project
Whakatāne Project Future Proof – Stage 3B
Southland Hospital MSB5 Ring Main Unit Replacement
NZQA | Office Relocation Services
Tokomaru Bay Landfill - Temporary Transfer Station Facility
Paengaroa School - Building works
Future ERP - System Integrator, Business Integrator, and Quality Assurance
Pākihikura (Opotiki) Harbour Dredging Contract - EOI
© 2026 SIA «Vietne». Toate drepturile rezervate.