This project is to upgrade the Heating Ventilation & Air Conditioning (HVAC) system to Building 114 at Unitec, 139 Carrington Road, Mt Albert, Auckland. The HVAC system in Building 114 is old and obsolete. It has heating function only served through two boilers in B113 plant room. Cooling systems has been retrofitted over the years, and this is not a good practice. We are looking to install a full HVAC system in B114 at Mount Albert campus based on design and specifications as provided in this RFP. This is a turnkey project so the project will require the main contractor to quote for BMS controls, Electrical and any E4M.
Prazo
23.10.2025
Publicado
19.12.2025
Concedido
19.12.2025
K Block Extract System Upgrade
Aberto para propostas·Oct 14
A-block Level 3 Science Lab Fitout
Fechado·Sep 13
A & B Auto-Door Replacement
Fechado·Sep 13
UNITEC Facilitation of Wananga on Stakeholder Aspirations in Vocational Education and Training
Concedido·Dec 19
RFP Engineering Services
Concedido·Dec 19
ARA L Block Seismic Strengthening Project
Concedido·Dec 19
Playground Upgrade at Sandspit Road School
Aberto para propostas·Oct 27
TKKM o Kawakawa mai Tawhiti - Gym Floor Replacement - Main Contractor Services
Aberto para propostas·Oct 27
Hinau St Retaining Wall Remediation Works
Aberto para propostas·Oct 27
Registration of Interest (ROI) for a Bathroom Refurbishment at Sunnybrae Normal School
Aberto para propostas·Oct 26
RFT for a Main Contractor for a new Hall for Chelsea Primary School
Aberto para propostas·Oct 26
Flooring and Wall Covering Installation Contractor for Blocks 5,7,8 Replace Floor and Wall Coverings at Papakura Central School
Aberto para propostas·Oct 26
Playground Upgrade at Sandspit Road School
Aberto para propostas·Oct 27
TKKM o Kawakawa mai Tawhiti - Gym Floor Replacement - Main Contractor Services
Aberto para propostas·Oct 27
Cannons Creek Cage Renewal
Aberto para propostas·Oct 27
Contract 26-76 - Rural Intersection Flag Lighting - Request for Proposal – Advertising Notice
Aberto para propostas·Oct 27
ROI - Future Waste Pathways
Aberto para propostas·Oct 27
Advance Notice | New Dunedin Hospital Inpatients Medium Temperature Hot Water Heat Pumps
Aberto para propostas·Oct 27
Crie uma conta para analisar este concurso e encontrar oportunidades semelhantes.