This project will replace the ageing automatic entry doors serving the main entrances to A Block and B Block together with the replacement of the existing passenger lift located in B Block. A and B Block Entrance doors: • Remove existing automatic entry doors. • Install new automatic sliding door system. • Remove existing Georgian wired glass screens. • Replace existing canopy roofing and cladding. • Remove asbestos cladding within project area. • Install new exterior cladding. • Install new internal and external timber screening. • Install new recessed entrance matting. • Reinstate existing access control system. B Block Passenger Lift: • Removal of existing lift equipment. • Installation of new lift. • New lift controls. • Modern accessibility features. • Improved reliability. • Compliance with current accessibility standards. Retentions are applicable. Contract works insurance to be arranged by WITT.
Publicado
13.09.2026
Aberto para propostas
13.09.2026
Prazo
15.10.2026
K Block Extract System Upgrade
Aberto para propostas·Oct 14
A-block Level 3 Science Lab Fitout
Fechado·Sep 13
UNITEC Facilitation of Wananga on Stakeholder Aspirations in Vocational Education and Training
Concedido·Dec 19
RFP Engineering Services
Concedido·Dec 19
ARA L Block Seismic Strengthening Project
Concedido·Dec 19
RFP Unitec Building 114 HVAC Upgrade
Concedido·Dec 19
UCOL Block 1 West & Block 3 Seismic Strengthening Project
Aberto para propostas·Oct 23
Main Building Contractor for H O Student Toilets Refurbisment at Tahatai Coast School
Aberto para propostas·Oct 18
Main Building Contractor for Blk A B Toilets Heating Electrical Upgrades & Classroom Remediation at Taradale High School
Aberto para propostas·Oct 15
Ngā Taupuni restroom refurbishment
Aberto para propostas·Sep 30
A-block Level 3 Science Lab Fitout
Fechado·Sep 13
Main Contractor for Project 262660 A B C N F K S T U V Roofing Drainage Electrical Cladding Plumbing at Edgecumbe Primary School
Fechado·Aug 27
Playground Upgrade at Sandspit Road School
Aberto para propostas·Oct 27
TKKM o Kawakawa mai Tawhiti - Gym Floor Replacement - Main Contractor Services
Aberto para propostas·Oct 27
Cannons Creek Cage Renewal
Aberto para propostas·Oct 27
Contract 26-76 - Rural Intersection Flag Lighting - Request for Proposal – Advertising Notice
Aberto para propostas·Oct 27
ROI - Future Waste Pathways
Aberto para propostas·Oct 27
Advance Notice | New Dunedin Hospital Inpatients Medium Temperature Hot Water Heat Pumps
Aberto para propostas·Oct 27
Crie uma conta para analisar este concurso e encontrar oportunidades semelhantes.