"The Opotiki CBD toilet block is in need of refurbishment as its internal fitting, fixtures, and finish are in a deteriorated state. The aim is to extend their practical life until a full rebuild is planned in approximately 5-6 years. Additionally, refurbishment of the toilets at Waiotahi Beach Surf Club is planned within the 2025 – 2026 financial year. Refurbishment of these facilities is important not only to maintain their functionality, but also to improve the amenity value in the area for residents, visitors and businesses in Opotiki District. What We Need The work for this contract is planned to be undertaken in two Separable Portions. Separable Portion 1 - Refurbishment of the Opotiki CBD toilets will include stripping out existing Fixtures; Floor treatment; repainting and relining of all interior surfaces; construction to extend cleaners’ room; conversion of parents room into disabled accessible; and replacement of robust and vandal-resistant plumbing fixtures (pans, basins, taps, hand driers, mirrors, hand-rails, etc) and lighting. Replacement of internal furniture, doors, and dividers, shelving and benching, with some internal wall construction is required. Some electrical and signage work will also be needed, together with incorporation of 2-fish design into design elements (e.g. flooring coatings and/ or glass etching, etc.) Glass - glass refurbishment/ de-scaling/ potentially with etching of the foyer glass. Separable Portion 2 Refurbishment of the toilet block adjacent to the Waiotahe Surf Club. Subject to good performance of the successful contractor for the works involved in Separable Portion 1, and acceptable pricing for Separable Portion 2, the contract will be extended to include Separable Portion 2. Works required for Separable Portion 2 have not yet been scoped in detail. A condition assessment and works scope is planned to take place late in 2025"
Prazo
07.10.2025
Publicado
03.02.2026
Concedido
03.02.2026
ODC Cont 277 -Security and Noise / Anima Control Services
Aberto para propostas·Oct 27
ODC Contract 288: Waiotahe Bluffs Detour Improvements Localised Widening Works 2026
Aberto para propostas·Oct 18
Pākihikura (Opotiki) Harbour Dredging Contract - EOI
Fechado·Sep 17
ODC Cont 279
Fechado·Aug 7
ODC Contract 286: Ōpōtiki Netball Court Upgrade 2026
Fechado·Aug 3
Advance Notice - Ōpōtiki Netball Courts Upgrade 2026
Fechado·Jul 13
CON640/822: Maraetai Road Stormwater Improvements
Aberto para propostas·Oct 21
Tayler Street Wastewater Pipe Renewal (Eltham)
Fechado·Sep 6
Ardwick Street Wastewater Renewal
Fechado·Aug 21
Contract 920 Waste and Water Main Renewals, Clyde St (SH1), Balclutha
Fechado·Aug 13
Erewhon Rural Water Scheme Pipe Renewals 2026-29
Fechado·Aug 3
Hunter Street Water Supply Pipe Renewal
Fechado·Jul 27
Long Range One Way Effector
Aberto para propostas·Nov 5
Craig Road Slip Repair (Whangarei Heads Road RP17940)
Aberto para propostas·Nov 5
Seatoun Tunnel Repainting
Aberto para propostas·Nov 4
130-140 Grafton Rd Retaining Wall Construction
Aberto para propostas·Nov 4
Main Contractor for the Blocks 2, 3, 4, 8: Replace Failed Door Ranch Sliders and Window Winders at Oteha Valley School
Aberto para propostas·Nov 4
Main Contractor for the Blocks 1, 4, 5, 6, 8: Roofing and Ceiling Tile Works at Oteha Valley School
Aberto para propostas·Nov 4
Crie uma conta para analisar este concurso e encontrar oportunidades semelhantes.