The Seatoun Tunnel, constructed in 1906–1907 by the former Miramar Borough Council, is a historically significant structure connecting the Wellington suburbs of Seatoun and Strathmore. It served as a key link for Wellington’s tram system and remains the main access point for Seatoun. Measuring approximately 144 meters in length and 8.2 meters in width, the tunnel now requires maintenance work. This includes cleaning and repainting the internal surfaces (walls and ceiling), the handrail and railing, the fencing above the Seatoun portal and the retaining wall at the Miramar end. Additionally, the footpath requires cleaning as well. As such, we are now requiring a qualified supplier to carry out painting and related maintenance works on the Tunnel.
Publicado
04.11.2026
Aberto para propostas
04.11.2026
Prazo
30.11.2026
130-140 Grafton Rd Retaining Wall Construction
Aberto para propostas·Nov 4
Kelburn Viaduct Safety Screens
Aberto para propostas·Nov 1
Hinau St Retaining Wall Remediation Works
Aberto para propostas·Oct 27
287-299 Karaka Bay Road – Seawall Renewal
Aberto para propostas·Oct 11
Landfill Rd, Opp 32 Stream Bank Remediation Works
Fechado·Oct 5
Future Recycling Processing Services
Fechado·Sep 28
130-140 Grafton Rd Retaining Wall Construction
Aberto para propostas·Nov 4
ROI - Drainage Contractor for Kaipara College - Site: Drainage Remediation
Aberto para propostas·Nov 3
Main Contractor for the Site: Carpark, Footpaths and Bus Shelter at Northcross Intermediate School
Aberto para propostas·Nov 3
Main Contractor for the Blocks 2, 11: Re-aligning classroom walls, Removal of ACM cladding, and Classroom Refurbishment at Northcross Intermediate School
Aberto para propostas·Nov 3
Main Contractor for the Block Temp: Classroom Refurbishment and Removal of ACM Cladding at Northcross Intermediate School
Aberto para propostas·Nov 3
Main Contractor for the Block 2: Toilet Refurbishment at Northcross Intermediate School
Aberto para propostas·Nov 3
130-140 Grafton Rd Retaining Wall Construction
Aberto para propostas·Nov 4
RFP Security Fencing OTRFP2026_649
Aberto para propostas·Nov 3
ROI - Drainage Contractor for Kaipara College - Site: Drainage Remediation
Aberto para propostas·Nov 3
Main Contractor for the Site: Carpark, Footpaths and Bus Shelter at Northcross Intermediate School
Aberto para propostas·Nov 3
Main Contractor for the Blocks 2, 11: Re-aligning classroom walls, Removal of ACM cladding, and Classroom Refurbishment at Northcross Intermediate School
Aberto para propostas·Nov 3
Main Contractor for the Block Temp: Classroom Refurbishment and Removal of ACM Cladding at Northcross Intermediate School
Aberto para propostas·Nov 3
Crie uma conta para analisar este concurso e encontrar oportunidades semelhantes.