The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: The supply and manufacture of precast concrete SBB units & bridge cill units
Publicado
13.07.2026
Aberto para propostas
13.07.2026
Prazo
20.07.2026
Manchester International Airport Phase 2 - Overbridge Civils
Fechado·Oct 23
Manchester International Airport - Rail Footprint Civils
Fechado·Oct 15
Manchester International Airport - Shotcrete works
Fechado·Oct 6
Manchester International Airport - OLE Phase 3 Works
Fechado·Sep 30
Manchester International Airport - Demolition Works
Fechado·Aug 27
Manchester International Airport - Permanent Way Works
Fechado·Aug 19
EAN - AOMR - Gipping Slab Replacement
Concedido·Aug 18
ST0581 Broughton Astley Deck Replacement Scheme - Manufacture of Precast Concrete Deck Slab Units
Concedido·May 19
ST0581 Broughton Astley Deck Replacement Scheme - Manufacture of Precast Concrete Deck Slab Units
Concedido·May 19
Supply Chain Notice: WC1857628 - B, C & D Antennas - Concrete Bases Repairs, Akrotriri (CYPRUS)
Fechado·Dec 17
Supply Chain Notice: WC1858011 - Salt Lake Site (West & East) - Remedial Works Following Condition Survey of the Feeder Line Supports (Phase 1 - CIDP26) (CYPRUS)
Fechado·Dec 17
TD2448 - Leisure procurement - Legal Support
Concedido·Nov 2
SAL19079 - Transpennine Railway Upgrade (TRU) W4
Concedido·Nov 2
GB-Cromer: PROC152 Car Park Re Surfacing Works
Aberto para propostas·Nov 2
National Witness Service and Homicide Service Evaluation Prerequisites
Concedido·Nov 2
Award of a call off contract under the Prison Education Dynamic Purchasing System for CSCS Card provision for prisoners at HMP Winchester
Concedido·Nov 2
Project management support for Wholesale Distribution Authorisation application - SECAmb
Concedido·Nov 2
Crie uma conta para analisar este concurso e encontrar oportunidades semelhantes.