"The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: -Installation, maintenance and removal of rail track protection. -Structural enabling and demolition works to an existing bridge structure. -Removal and disposal of road and pavement surfacing, kerbs, ducts and associated materials. -Careful removal and storage of existing coping stones and pilaster caps for potential reuse. -Demolition of existing parapets, pilasters, precast beams, cill beams and south abutment concrete. -Demolition and disposal of bridge structural elements in accordance with project requirements. -Working within a rail environment with compliance to all relevant safety and possession requirements."
Publicado
27.08.2026
Aberto para propostas
27.08.2026
Prazo
03.09.2026
Manchester International Airport Phase 2 - Overbridge Civils
Fechado·Oct 23
Manchester International Airport - Rail Footprint Civils
Fechado·Oct 15
Manchester International Airport - Shotcrete works
Fechado·Oct 6
Manchester International Airport - OLE Phase 3 Works
Fechado·Sep 30
Manchester International Airport - Permanent Way Works
Fechado·Aug 19
Manchester International Airport - Precast Concrete Beams
Fechado·Jul 13
Manchester International Airport - OLE Phase 3 Works
Fechado·Sep 30
Brewery Turnback - ES6-8 OLE Civilis / Foundations Works
Fechado·Oct 7
Brewery Turnback - ES6-8 Permanent Way
Fechado·Oct 7
2026-10-28 09:00 - QSB467 Ipswich to Pushforward Secondary (various locations in Ipswich, Stowmarket & Bury St Edmunds) - AWARD
Concedido·Oct 31
March 2027 Bus Contracts
Concedido·Oct 31
Infrastructure Connection Design Support - Pathology Lab
Concedido·Oct 30
Provision of Pre-Paid Cards
Concedido·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Concedido·Oct 30
Business Travel Services
Concedido·Oct 30
Crie uma conta para analisar este concurso e encontrar oportunidades semelhantes.