Otnox
NZNew Zealand·Innkjøper: Westland District Council

WCWT New Totara River Bridge RFP

Tildelt·27 nov. 2025

A.1.2 Invitation to Submit Proposal On behalf of the Principal, we are inviting proposals to design and construct the works of the above-named Contract. The Contract Works include design and construction of a new Totara River Suspension Bridge for use by cyclists and pedestrians, and a light maintenance vehicle, and are described in more detail below. Proposals for the Contract must be prepared and submitted in accordance with the conditions of proposals in A.2. A valid proposal requires the submission of the items in the checklist in B.1 signed where indicated by an authorised representative of the proposer.

Frist

17.10.2025

Publisert

27.11.2025

Tildelt

27.11.2025

Otnox

Finn anskaffelser det er verdt å delta i.

Opprett en konto for å undersøke anskaffelsen og finne lignende muligheter.

  • AnskaffelsesdokumenterSe tilgjengelige filer i ett arbeidsområde.
  • Krav og risikoerBestill dokumentanalyse med henvisninger til kildene.
  • Ditt utvalg av anskaffelserFortsett med dine valgte markeder og bransjer.