The Hokitika swimming pool currently has a diesel boiler heating the pool water temperature, and electrical heaters for space heaters. We are looking to replace the diesel boiler to lower operational costs from the diesel boiler, and improve the space heating to provide a better environment within the swimming pool concourse • Electrical main board upgrade and power supply to new heating systems • Design & build new platform and enclosure, with acoustic screening and access. Strengthening of existing plantroom enclosure • Supply and install new AHU and heat pump and connect into existing plantroom
Publisert
06.05.2026
Tildelt
06.05.2026
Livingstone Street Stormwater Renewal
Lukket·Jul 23
18-19-08 Arahura Water Treatment Plant
Tildelt·Apr 17
South Westland Solid Waste and Recycling Services
Tildelt·Mar 26
Ross Swimming Pool Renovation 25-26-06
Tildelt·Mar 26
Haast Watermains Upgrade
Tildelt·Nov 27
WCWT New Totara River Bridge RFP
Tildelt·Nov 27
Main Contractor for Block E (Music Suite) Roof & Wall Recladding at Maruawai College
Åpen for tilbud·Nov 1
Main Contractor for Roofing Refurbishment at Avalon School (Wellington)
Åpen for tilbud·Nov 1
Notice of Information - Napier City Council Tender Dates Over Holiday Season
Åpen for tilbud·Nov 1
Howick Fire Station
Åpen for tilbud·Nov 1
SCI_2600812 High Stage Rating Curve Modelling
Åpen for tilbud·Nov 1
Kelburn Viaduct Safety Screens
Åpen for tilbud·Nov 1
Opprett en konto for å undersøke anskaffelsen og finne lignende muligheter.