The waterproofing package includes the supply of all materials, namely bonded and unbonded membranes, waterbar materials and accessories, which are assembled and installed to form a specific waterproofing system to meet the design requirements. Dependent on the waterproofing system used, the waterproofing materials can be cast into the concrete when poured or applied post pour. The system design is installed to prevent the ingress of water into. The requirement includes 120,000 m2 bonded membrane, 45,000 m2 unbonded membrane, 30,000 l/m joint waterbars, 4,500 l/m hydrophilic waterbars, 15,800 l/m elastomer waterbars, 36,540 l/m PVC waterbars as well as related accessories such as 22,000 units of sealants and adhesives and compressible materials to suit seismic design.
Publisert
14.04.2026
Åpen for tilbud
14.04.2026
Frist
23.04.2026
Tunnel Segment Production Monitoring System copy
Lukket·Aug 17
Tunnel Segment Production Monitoring System
Lukket·Aug 12
Site Power HV/LV Electrical Design
Lukket·Aug 10
Tunnel Segment Production Monitoring System
Lukket·Aug 6
Fire and Rescue Services
Lukket·Apr 29
Instrumentation and Monitoring
Lukket·Apr 29
CA17911 - Roofing Works Leicester College
Lukket·May 27
CA17911 - Roofing Works Leicester College
Lukket·May 27
SZC - Waterproofing Materials
Lukket·Apr 14
PAHT - Waterproofing Works in Plantrooms
Tildelt·Mar 24
PAHT - Waterproofing Works in Plantrooms
Tildelt·Mar 24
GB-Headington: MW2507 - Hastoe - Balcony Remediation Works
Tildelt·Feb 26
Housing & Property Management Level 4 apprenticeships
Tildelt·Nov 3
Fire Remediation works - Baker House (D&B)
Tildelt·Nov 3
Humber Economic Strategy Delivery Plan
Tildelt·Nov 3
ENHT - Legal Support HCH PFI 2026
Tildelt·Nov 3
Super Pumping Appliances
Tildelt·Nov 3
APEX and PowerApp Support
Tildelt·Nov 3
Opprett en konto for å undersøke anskaffelsen og finne lignende muligheter.