This project involves the manufacturing, transportation and installation of approximately 39000 precast concrete tunnel segments. The segments will be produced at Avonmouth tunnel precast factory, transported through a multi-modal logistics network (truck and train interfaces), stored across 4 facilities (TPF, Railhead, ACA and TLC), ultimately installed within three TBMs serving two intake tunnels and one outfall tunnel configuration. This operation requires complete end-to-end visibility from the moment a segment is cast until it is installed within the tunnel structure. Currently, critical gaps exist in reporting, quality traceability, inventory discrepancies, and segment tracking across the supply chain. A comprehensive traceability system is essential to manage the entire lifecycle, prevent installation errors, ensure quality compliance, eliminate segment duplication, and maintain supply chain transparency across all stakeholders.
Publisert
17.08.2026
Åpen for tilbud
17.08.2026
Frist
21.08.2026
Tunnel Segment Production Monitoring System
Lukket·Aug 12
Site Power HV/LV Electrical Design
Lukket·Aug 10
Tunnel Segment Production Monitoring System
Lukket·Aug 6
Fire and Rescue Services
Lukket·Apr 29
Instrumentation and Monitoring
Lukket·Apr 29
Instrumentation and Monitoring
Lukket·Apr 29
Tunnel Segment Production Monitoring System
Lukket·Aug 12
Tunnel Segment Production Monitoring System
Lukket·Aug 6
Housing & Property Management Level 4 apprenticeships
Tildelt·Nov 3
Fire Remediation works - Baker House (D&B)
Tildelt·Nov 3
Humber Economic Strategy Delivery Plan
Tildelt·Nov 3
ENHT - Legal Support HCH PFI 2026
Tildelt·Nov 3
Super Pumping Appliances
Tildelt·Nov 3
APEX and PowerApp Support
Tildelt·Nov 3
Opprett en konto for å undersøke anskaffelsen og finne lignende muligheter.