Design Options and Viability Assessments for the Future Development of Oxford Town Hall
Frist
03.06.2026
Publisert
27.07.2026
Tildelt
27.07.2026
School Mentoring for resettled refugee families - AWARD
HNES Optimisation Studies for Three Sites - AWARD
Lenovo Laptops_2 - AWARD
RFQ for RIBA Stage 2 Compliant Whole Site Decarbonisation Plans for Two Oxford City Council Depots - AWARD
Sport England Framework - Competitive Procedure - Lot A - AWARD
Sport England Framework - Competitive Procedure - Lot A - AWARD
NW CDF Lot 1 Failure Mode Affect Analysis
NCC1927 Northumberland Local Plan Transport Evidence Base
Full RIBA Feasibility study for Roof Replacement of Stoke Newington Town Hall
Hackney Service Centre cooling system redesign feasibility study
FCDO Port Louis New HC Residence Project RIBA Stage 4 Design Peer Review Services
FCDO Port Louis New HC Residence Project RIBA Stage 4 Design Peer Review Services
ENQ1347 - Ice Rink for Festive Derby
Internal Audit Plan 25-26
Passenger Lift Replacement Within Diplomatic Mission
Pakistan NDC 3.0 Delivery Coordination Mechanism (Federal-Provincial Coordination and Tracking)
GB-Sheffield: Legal services Project Espresso
Tactical End User Compute service
© 2026 SIA «Vietne». Alle rettigheter forbeholdt.