A new extension to the rear of the fire station to provide 6nr changing cubicles and space for storage lockers. Internal works within the station will form a new opening to the extension and a new disabled changing area and separate WC.
Frist
09.01.2026
Publisert
10.02.2026
Awarded
10.02.2026
BE049 Parkhouse Street Design and Build Contract
SIXEP/FHP Main Roof Refurbishment Project
CBC-1970-T-SM A&A Works-Single Story Extension - AWARD
Dirty Utility Works GRH Tower Block
Kitchen & Bathroom Replacements
Consultancy re. Replacement of Roof and Solar Panels at Cranleigh Health Centre
ENQ1347 - Ice Rink for Festive Derby
Internal Audit Plan 25-26
Passenger Lift Replacement Within Diplomatic Mission
Pakistan NDC 3.0 Delivery Coordination Mechanism (Federal-Provincial Coordination and Tracking)
GB-Sheffield: Legal services Project Espresso
Tactical End User Compute service
© 2026 SIA «Vietne». Alle rettigheter forbeholdt.