The Tower Block Dirty Utility Conversion works at Gloucestershire Royal Hospital comprise the conversion of existing dirty utility rooms into bin stores as part of remedial measures to improve fire safety. The scope of works includes isolating and draining down the hot and cold-water services; removing redundant pipework, fittings and waste connections serving the sluice sink; stripping out the existing worktop and wall-mounted fixtures; isolating and removing socket fronts to facilitate the installation of floor-to-ceiling white rock wall cladding with jointing strips; reinstating socket fronts upon completion; providing Chapter 8 barriers to the lift lobby and ward access areas; checking that riser cupboard door locks and slip bolts are operational; and providing a banksman as required.
Frist
14.08.2026
Publisert
08.09.2026
Tildelt
08.09.2026
Clerk of Works (Fire Alarm Replacement Scheme)
Tildelt·Oct 12
Provision of Emergency Asbestos-related works
Tildelt·Sep 2
King Builders Various Minor Works Projects
Tildelt·Aug 19
Women's Centre Fire Door Mag Lock Works
Tildelt·Aug 18
Project Management Support _ Provelio
Tildelt·Aug 17
CGH BMS Upgrade Project 2026/2027
Tildelt·Aug 6
Turnkey renovation of the room for the installation of CT Scanner equipment at NSECH
Tildelt·Oct 26
Stanley Health Centre Roof & Ventilation plant replacement
Tildelt·Oct 26
Bridport Maintenance Compound - Construction Contract
Tildelt·Oct 23
Greener Homes Initiative 26/27 - Phase 19
Tildelt·Oct 23
Greener Homes Initiative 26/27 - Phase 20
Tildelt·Oct 23
CA18585 - ITT Repair and replacement works to whole site drainage system
Åpen for tilbud·Oct 20
Housing & Property Management Level 4 apprenticeships
Tildelt·Nov 3
Fire Remediation works - Baker House (D&B)
Tildelt·Nov 3
Humber Economic Strategy Delivery Plan
Tildelt·Nov 3
ENHT - Legal Support HCH PFI 2026
Tildelt·Nov 3
Super Pumping Appliances
Tildelt·Nov 3
APEX and PowerApp Support
Tildelt·Nov 3
Opprett en konto for å undersøke anskaffelsen og finne lignende muligheter.