The works are required to ensure a safe fire escape route for staff and the public and involve the installation of a protective ceiling system beneath an existing suspended ceiling. The solution includes the installation of a structural timber framework and plywood barrier designed to contain falling debris and maintain safe access and headroom. All works will be carried out in accordance with the Control of Asbestos Regulations 2012 and relevant health and safety legislation. The works include site preparation, installation, sealing to prevent dust migration, and full clean-up. This requirement has been identified as urgent due to health and safety risks associated with the existing conditions, and immediate action is required to ensure compliance and safe operation of the facility.
Frist
14.08.2026
Publisert
02.09.2026
Tildelt
02.09.2026
Clerk of Works (Fire Alarm Replacement Scheme)
Tildelt·Oct 12
Dirty Utility Works GRH Tower Block
Tildelt·Sep 8
King Builders Various Minor Works Projects
Tildelt·Aug 19
Women's Centre Fire Door Mag Lock Works
Tildelt·Aug 18
Project Management Support _ Provelio
Tildelt·Aug 17
CGH BMS Upgrade Project 2026/2027
Tildelt·Aug 6
Housing & Property Management Level 4 apprenticeships
Tildelt·Nov 3
Fire Remediation works - Baker House (D&B)
Tildelt·Nov 3
Humber Economic Strategy Delivery Plan
Tildelt·Nov 3
ENHT - Legal Support HCH PFI 2026
Tildelt·Nov 3
Super Pumping Appliances
Tildelt·Nov 3
APEX and PowerApp Support
Tildelt·Nov 3
Opprett en konto for å undersøke anskaffelsen og finne lignende muligheter.