Replacement of playground at Elephant Park, otherwise know as Petham Park. To replace current wetpour base with a new wetpour safety surface which compiles with BSEN 1176 and has a minimum guarantee of 2 years but preferably longer. A maintenance plan is a desirable extra service we would like. The product should have been tested in accordance with BS EN 1177 and BS EN 7188. To remove existing equipment unless agreed otherwise and replace with new equipment with a significantly uplifted play value compared to the current playground. The area and equipment where possible should follow a jungle theme with a center piece designed to look like an elephant.
Frist
16.01.2026
Publisert
05.02.2026
Awarded
05.02.2026
Play Area Replacement at St Johns Open Space, Newton-le-Willows
Tildelt·Oct 28
Bespoke Playground for Bouverie Square, Folkestone
Tildelt·Oct 22
West Bridgford Playground Refurbishment - Toddler and Junior Area - The Hook Lady Bay
Tildelt·Oct 19
ENQ1326
Tildelt·Oct 14
Skateboard Park Remodelling
Åpen for tilbud·Oct 6
Whittle Street Play Area
Tildelt·Oct 5
2026-10-28 09:00 - QSB467 Ipswich to Pushforward Secondary (various locations in Ipswich, Stowmarket & Bury St Edmunds) - AWARD
Tildelt·Oct 31
March 2027 Bus Contracts
Tildelt·Oct 31
Infrastructure Connection Design Support - Pathology Lab
Tildelt·Oct 30
Provision of Pre-Paid Cards
Tildelt·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Tildelt·Oct 30
Business Travel Services
Tildelt·Oct 30
Opprett en konto for å undersøke anskaffelsen og finne lignende muligheter.