Otnox
UKStorbritannia·Innkjøper: Swanley Town Council

Elephant Park Playground Replacement

Tildelt·9 okt. 2025·GBP 72,000

Replacement of playground at Elephant Park, otherwise know as Petham Park. To replace current wetpour base with a new wetpour safety surface which compiles with BSEN 1176 and has a minimum guarantee of 2 years but preferably longer. A maintenance plan is a desirable extra service we would like. The product should have been tested in accordance with BS EN 1177 and BS EN 7188. To remove existing equipment unless agreed otherwise and replace with new equipment with a significantly uplifted play value compared to the current playground. The area and equipment where possible should follow a jungle theme with a center piece designed to look like an elephant.

Publisert

09.10.2025

Åpen for tilbud

09.10.2025

Frist

16.01.2026

Tildelt

05.02.2026

Otnox

Finn anskaffelser det er verdt å delta i.

Opprett en konto for å undersøke anskaffelsen og finne lignende muligheter.

  • AnskaffelsesdokumenterSe tilgjengelige filer i ett arbeidsområde.
  • Krav og risikoerBestill dokumentanalyse med henvisninger til kildene.
  • Ditt utvalg av anskaffelserFortsett med dine valgte markeder og bransjer.