This D&B, 2-Stage Contract, is to reconstruct the bridge, including further actions (and not limited to) liaising with Network Rail (BAPA required for the works), ground investigation, scour assessment, obtaining approvals (i.e. LLFA), collaborative working with WAF Legal Team and Landowners, removal of the rock rolls, training walls repairs and construction, culvert repairs and reinstatement of the highway approach. Construction is to take place during the 2027 'in-river working window', or sooner.
Frist
21.01.2026
Publisert
07.07.2026
Tildelt
07.07.2026
CWF Lot 2A - Garrigill Retaining Wall Rebuild
Tildelt·Nov 2
PSF4 Lot 2B - Structural Assessments - A590 Jubilee Bridge Walney
Tildelt·Nov 2
CWF Lot 2B - Riverside Corridor, Kendal, Active Travel
Tildelt·Sep 18
Barrow Multi-Modal Transport Study
Tildelt·Jul 7
Lot 1b - Up to 8 Passenger Seats with Passenger Assistant for various areas closing 23 February 2026 (F43)
Tildelt·Jun 16
Lot 1a - Up to 8 passenger seats for various areas closing 23 February 2026 (F43)
Tildelt·Jun 16
Civic Centre Strip out
Tildelt·Nov 3
NSC-0687-26; Repair and Rebuild Works to Three Bridges and a Retaining Wall LOT2
Tildelt·Nov 3
Ca18632 - R9386 - Shgh - Ferguson Wc
Åpen for tilbud·Nov 3
Acis Group - Internal, external and associated works
Tildelt·Nov 3
PLACE1393H MHA PSP4 Agency Staff - General Civil and Highway Activities -26/27 - GL
Tildelt·Nov 2
PLACE1394H MHA PSP4 Agency Staff - General Civil and Highway Activities -26/27 - JS
Tildelt·Nov 2
Housing & Property Management Level 4 apprenticeships
Tildelt·Nov 3
Fire Remediation works - Baker House (D&B)
Tildelt·Nov 3
Humber Economic Strategy Delivery Plan
Tildelt·Nov 3
ENHT - Legal Support HCH PFI 2026
Tildelt·Nov 3
Super Pumping Appliances
Tildelt·Nov 3
APEX and PowerApp Support
Tildelt·Nov 3
Opprett en konto for å undersøke anskaffelsen og finne lignende muligheter.