Barrow Multi-Modal Transport Study Study will assess the impact of jobs and economic growth in Barrow through the use of scenarios and identify potential intervention measures required to support this growth.
Frist
07.04.2026
Publisert
07.07.2026
Tildelt
07.07.2026
CWF Lot 2A - Garrigill Retaining Wall Rebuild
Tildelt·Nov 2
PSF4 Lot 2B - Structural Assessments - A590 Jubilee Bridge Walney
Tildelt·Nov 2
CWF Lot 2B - Riverside Corridor, Kendal, Active Travel
Tildelt·Sep 18
CWF Lot 2B - Broadhead Bridge (Replacement Structure)
Tildelt·Jul 7
Lot 1b - Up to 8 Passenger Seats with Passenger Assistant for various areas closing 23 February 2026 (F43)
Tildelt·Jun 16
Lot 1a - Up to 8 passenger seats for various areas closing 23 February 2026 (F43)
Tildelt·Jun 16
Crossens Pumping Station Pre SOC
Tildelt·Nov 2
SW - WSX - Direct Award AOMR Lot 1 - North Drain LOW ROOFS
Tildelt·Oct 30
SW - WSX - Direct Award AOMR Lot 1 - Phase 2 Pumping Station Roofs
Tildelt·Oct 30
SW - WSX - Direct Award AOMR Lot 1 - Beaminster and Swanage Reservoir Repairs
Tildelt·Oct 29
ITEP1261 - I&P Cloud DevSecOps Engineering & FINOPS team
Tildelt·Oct 28
Framework for Call-down Technical Assistance - Engineering and Climate-Resilient Infrastructure Advisory Services (BRAVE-IS)
Åpen for tilbud·Oct 23
Housing & Property Management Level 4 apprenticeships
Tildelt·Nov 3
Fire Remediation works - Baker House (D&B)
Tildelt·Nov 3
Humber Economic Strategy Delivery Plan
Tildelt·Nov 3
ENHT - Legal Support HCH PFI 2026
Tildelt·Nov 3
Super Pumping Appliances
Tildelt·Nov 3
APEX and PowerApp Support
Tildelt·Nov 3
Opprett en konto for å undersøke anskaffelsen og finne lignende muligheter.