To construct the main works, the (Ferrovial BAM JV) Track Systems Contractor (FBRS) will develop and operate temporary railheads/connections to the Network Rail infrastructure, to meet the construction logistics requirements for material deliveries by rail and support the requirements of other Railway System Contractors from the Alliance. These railheads/connections require temporary rail track works that will not form part of the final permanent works. The Temporary Railhead designs required are located at: • West Ruislip (Copthall) Temporary Railhead • Chiltern South Temporary Railhead • Berkswell Temporary Railhead • Washwood Heath Temporary Connection The Consultant shall achieve integration and coordination between temporary and permanent works design, liaising with the Permanent Works Designer. The scope of this required design works are as follows - Track layout and geometry, Track, Track drainage, LWR and S&C hardstanding areas, gantry foundations. Potential mobilization start (soft start) in September 2026 - then estimated full start February 2027.
Gepubliceerd
01.05.2026
Open voor inschrijvingen
01.05.2026
Sluitingsdatum
15.05.2026
Specialist Rail Systems Personnel
Open voor inschrijvingen·Oct 28
Transport of slabs
Open voor inschrijvingen·Oct 21
LWR Trailer Solution
Gesloten·Aug 18
Temporary Works Designer (Track Design Railhead)
Gesloten·May 1
Temporary Works Designer - Framework
Gesloten·May 1
Temporary Works Designer - Framework
Gesloten·May 1
Contract Award Notice - Repair damaged sections of the coping at Benson lock and repointing brickwork and stone coping in the lock chamber
Gegund·Nov 2
Specialist Rail Systems Personnel
Open voor inschrijvingen·Oct 28
NE - CDF - Lot 1 - River Hipper FAS SOC to OBC Appraisal
Gegund·Oct 27
EAN - AOMR - Lot 1 - Snettisham Hard Defence Repairs
Gegund·Oct 27
Contract Award Notice - Tree Inspections & Tree Works for Upper Thames 26-27 - Lot 3
Gegund·Oct 26
Temporary Agency Staff for Drainage Engineer
Gegund·Oct 20
Housing & Property Management Level 4 apprenticeships
Gegund·Nov 3
Fire Remediation works - Baker House (D&B)
Gegund·Nov 3
Humber Economic Strategy Delivery Plan
Gegund·Nov 3
ENHT - Legal Support HCH PFI 2026
Gegund·Nov 3
Super Pumping Appliances
Gegund·Nov 3
APEX and PowerApp Support
Gegund·Nov 3
Maak een account aan om deze aanbesteding te onderzoeken en vergelijkbare kansen te vinden.