To construct the main works, the (Ferrovial BAM JV) Track Systems Contractor (FBRS) will develop and operate various compounds (including railheads) along the route, to meet the construction logistics requirements of FBRS and also support the requirements of other Railway System Contractors from the Alliance. These compounds will require temporary works that will not form part of the final permanent works. The number and location of the compounds to be used are still to be confirmed at this stage: The Consultant shall achieve integration and coordination between temporary and permanent works design, liaising with the Permanent Works Designer where required. Examples of the scope of this required design works are as follows (but not limited to) within compounds and railheads- •Temporary site buildings and offices •Temporary utilities & services •Temporary roadways and hardstandings •Temporary site drainage systems •Fencing •Lighting & Security systems Note: the scope does not include any design of Track layouts and geometry, Track, Track drainage, LWR and S&C hardstanding areas, associated gantry foundations within the railheads. Potential mobilization start (soft start) in October 2026 - then estimated full start February 2027.
Gepubliceerd
01.05.2026
Open voor inschrijvingen
01.05.2026
Sluitingsdatum
15.05.2026
Specialist Rail Systems Personnel
Open voor inschrijvingen·Oct 28
Transport of slabs
Open voor inschrijvingen·Oct 21
LWR Trailer Solution
Gesloten·Aug 18
Temporary Works Designer (Track Design Railhead)
Gesloten·May 1
Temporary Works Designer - Framework
Gesloten·May 1
Temporary Works Designer (Track Design Railhead)
Gesloten·May 1
Contract Award Notice - Repair damaged sections of the coping at Benson lock and repointing brickwork and stone coping in the lock chamber
Gegund·Nov 2
Specialist Rail Systems Personnel
Open voor inschrijvingen·Oct 28
NE - CDF - Lot 1 - River Hipper FAS SOC to OBC Appraisal
Gegund·Oct 27
EAN - AOMR - Lot 1 - Snettisham Hard Defence Repairs
Gegund·Oct 27
Contract Award Notice - Tree Inspections & Tree Works for Upper Thames 26-27 - Lot 3
Gegund·Oct 26
Temporary Agency Staff for Drainage Engineer
Gegund·Oct 20
Housing & Property Management Level 4 apprenticeships
Gegund·Nov 3
Fire Remediation works - Baker House (D&B)
Gegund·Nov 3
Humber Economic Strategy Delivery Plan
Gegund·Nov 3
ENHT - Legal Support HCH PFI 2026
Gegund·Nov 3
Super Pumping Appliances
Gegund·Nov 3
APEX and PowerApp Support
Gegund·Nov 3
Maak een account aan om deze aanbesteding te onderzoeken en vergelijkbare kansen te vinden.