Supply and installation / construction services for new culverts across the Karamea Highway Bluff Rd section. Work includes supply and trenching and backfill/compaction for approximately 36m of 900dia Class 4 Concrete pipe, 28m of 750dia Class 4 Concrete pipe and 15m of Class 4 Concrete 600dia pipe. Work will include associated precast concrete headwalls and rock rip rap for each of the five culvert crossings. Trench surface is to be reinstated with a two coat grade 3/5 chip seal. Trench depths will vary between 2m to approximately 3m.
Gepubliceerd
18.08.2026
Open voor inschrijvingen
18.08.2026
Sluitingsdatum
15.09.2026
Morrinsville School - Blocks A, C, D, FA (Board), H, J, L, N - Roofing Works
Main Building Contractor for Stage 2 of the Learning Support Fencing project at Waiopehu College
Registration of Interest - Main Contractor for Block 19 (Full) & Block 24, 25 (Partial) Cladding Replacement at St Albans School
RFT - Whakatane High School - 5YA (SP1 & SP2) – Multiple Blocks Remediation Works – Main Contractor
ROI for Main Contractor for 2x10YPP Projects and and Potential Additional Rights at Te Kura o Te Kao
Main Contractor for Verran Primary School – Block 3 Internal Refurbishments
Fleet Maintenance and Repair - Central Lakes
Morrinsville School - Blocks A, C, D, FA (Board), H, J, L, N - Roofing Works
Non-Teaching Staff PLD Panel - Neurodiversity
RFT - Whakatane High School - 5YA Blocks B, G and H Remediation Works
Main Building Contractor for Stage 2 of the Learning Support Fencing project at Waiopehu College
Registration of Interest - Main Contractor for Block 19 (Full) & Block 24, 25 (Partial) Cladding Replacement at St Albans School
© 2026 SIA «Vietne». Alle rechten voorbehouden.