The Council requires a suitably qualified contractor to undertake private stormwater–wastewater separation works on up to 106 private residential properties within the Roebuck catchment, as Stage 1 of the wider program of works. The works involve design and installation of dedicated private stormwater drainage, disconnection of stormwater inflows from the wastewater system, and reinstatement of affected surfaces. The contract will be delivered on a measure-and-value basis using a priced Schedule of Prices, with work orders released progressively against confirmed properties. The program timeframe for Stage 1 delivery is 18 months from award of contract. NB: All Tender Files have been attached as Addenda.
Gepubliceerd
24.06.2026
Open voor inschrijvingen
24.06.2026
Sluitingsdatum
05.08.2026
Tayler Street Wastewater Pipe Renewal (Eltham)
Ardwick Street Wastewater Renewal
Contract 920 Waste and Water Main Renewals, Clyde St (SH1), Balclutha
Erewhon Rural Water Scheme Pipe Renewals 2026-29
Hunter Street Water Supply Pipe Renewal
Contract 917 Richardson Upgrades/Renewals for Pipelines - Moffat Road
Fleet Maintenance and Repair - Central Lakes
Morrinsville School - Blocks A, C, D, FA (Board), H, J, L, N - Roofing Works
Non-Teaching Staff PLD Panel - Neurodiversity
RFT - Whakatane High School - 5YA Blocks B, G and H Remediation Works
Main Building Contractor for Stage 2 of the Learning Support Fencing project at Waiopehu College
Registration of Interest - Main Contractor for Block 19 (Full) & Block 24, 25 (Partial) Cladding Replacement at St Albans School
© 2026 SIA «Vietne». Alle rechten voorbehouden.