This D&B, 2-Stage Contract, is to reconstruct the bridge, including further actions (and not limited to) liaising with Network Rail (BAPA required for the works), ground investigation, scour assessment, obtaining approvals (i.e. LLFA), collaborative working with WAF Legal Team and Landowners, removal of the rock rolls, training walls repairs and construction, culvert repairs and reinstatement of the highway approach. Construction is to take place during the 2027 'in-river working window', or sooner.
Sluitingsdatum
21.01.2026
Gepubliceerd
07.07.2026
Gegund
07.07.2026
CWF Lot 2A - Garrigill Retaining Wall Rebuild
Gegund·Nov 2
PSF4 Lot 2B - Structural Assessments - A590 Jubilee Bridge Walney
Gegund·Nov 2
CWF Lot 2B - Riverside Corridor, Kendal, Active Travel
Gegund·Sep 18
Barrow Multi-Modal Transport Study
Gegund·Jul 7
Lot 1b - Up to 8 Passenger Seats with Passenger Assistant for various areas closing 23 February 2026 (F43)
Gegund·Jun 16
Lot 1a - Up to 8 passenger seats for various areas closing 23 February 2026 (F43)
Gegund·Jun 16
Civic Centre Strip out
Gegund·Nov 3
NSC-0687-26; Repair and Rebuild Works to Three Bridges and a Retaining Wall LOT2
Gegund·Nov 3
Ca18632 - R9386 - Shgh - Ferguson Wc
Open voor inschrijvingen·Nov 3
Acis Group - Internal, external and associated works
Gegund·Nov 3
PLACE1393H MHA PSP4 Agency Staff - General Civil and Highway Activities -26/27 - GL
Gegund·Nov 2
PLACE1394H MHA PSP4 Agency Staff - General Civil and Highway Activities -26/27 - JS
Gegund·Nov 2
Housing & Property Management Level 4 apprenticeships
Gegund·Nov 3
Fire Remediation works - Baker House (D&B)
Gegund·Nov 3
Humber Economic Strategy Delivery Plan
Gegund·Nov 3
ENHT - Legal Support HCH PFI 2026
Gegund·Nov 3
Super Pumping Appliances
Gegund·Nov 3
APEX and PowerApp Support
Gegund·Nov 3
Maak een account aan om deze aanbesteding te onderzoeken en vergelijkbare kansen te vinden.