Barrow Multi-Modal Transport Study Study will assess the impact of jobs and economic growth in Barrow through the use of scenarios and identify potential intervention measures required to support this growth.
Sluitingsdatum
07.04.2026
Gepubliceerd
07.07.2026
Gegund
07.07.2026
CWF Lot 2A - Garrigill Retaining Wall Rebuild
Gegund·Nov 2
PSF4 Lot 2B - Structural Assessments - A590 Jubilee Bridge Walney
Gegund·Nov 2
CWF Lot 2B - Riverside Corridor, Kendal, Active Travel
Gegund·Sep 18
CWF Lot 2B - Broadhead Bridge (Replacement Structure)
Gegund·Jul 7
Lot 1b - Up to 8 Passenger Seats with Passenger Assistant for various areas closing 23 February 2026 (F43)
Gegund·Jun 16
Lot 1a - Up to 8 passenger seats for various areas closing 23 February 2026 (F43)
Gegund·Jun 16
Crossens Pumping Station Pre SOC
Gegund·Nov 2
SW - WSX - Direct Award AOMR Lot 1 - North Drain LOW ROOFS
Gegund·Oct 30
SW - WSX - Direct Award AOMR Lot 1 - Phase 2 Pumping Station Roofs
Gegund·Oct 30
SW - WSX - Direct Award AOMR Lot 1 - Beaminster and Swanage Reservoir Repairs
Gegund·Oct 29
ITEP1261 - I&P Cloud DevSecOps Engineering & FINOPS team
Gegund·Oct 28
Framework for Call-down Technical Assistance - Engineering and Climate-Resilient Infrastructure Advisory Services (BRAVE-IS)
Open voor inschrijvingen·Oct 23
Housing & Property Management Level 4 apprenticeships
Gegund·Nov 3
Fire Remediation works - Baker House (D&B)
Gegund·Nov 3
Humber Economic Strategy Delivery Plan
Gegund·Nov 3
ENHT - Legal Support HCH PFI 2026
Gegund·Nov 3
Super Pumping Appliances
Gegund·Nov 3
APEX and PowerApp Support
Gegund·Nov 3
Maak een account aan om deze aanbesteding te onderzoeken en vergelijkbare kansen te vinden.