Loading Otnox...
Otnox
NZNaujoji Zelandija·Perkančioji organizacija: Christchurch City Council

Water Supply PS1060 Scarborough 1 - Rockfall Mitigation

Sutartis suteikta·21 bal. 2026

The present location of the Scarborough 1 Pump Station (PS1060) is exposed to Rockfall (boulder roll) hazard. Although the building was not damaged by rockfall during the Canterbury Earthquake Sequence (CES), one boulder came to rest against the back wall, and several other nearby boulders rolled far enough that they would have impacted the building if their trajectory had been in line with it. The CCC Technical Services team completed a Rockfall Hazard Assessment to establish the likely medium-to-long-term risk to the existing pump station due to rockfall, and to consider what remediation methods may be suitable to mitigate the risk.

Terminas

20.03.2026

Paskelbta

21.04.2026

Sutartis suteikta

21.04.2026

Otnox

Raskite pirkimus, kuriuose verta dalyvauti.

Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.

  • Pirkimo dokumentaiPeržiūrėkite turimus failus vienoje darbo aplinkoje.
  • Reikalavimai ir rizikosUžsakykite dokumentų analizę su nuorodomis į šaltinius.
  • Jūsų pirkimų atrankaTęskite su pasirinktomis rinkomis ir veiklos sritimis.