Otnox
NZNaujoji Zelandija·Perkančioji organizacija: Christchurch City Council

Stormwater Cave Rock Outlet Structure Renewal (Sumner)

Sutartis suteikta·14 geg. 2026

The contract work comprises stormwater upgrade works at two locations in Sumner: •Cave Rock outfall (Richmond Hill Drain outfall): Modification of the existing stormwater outfall, construction of a new reinforced concrete outfall extension and access chamber, installation of a new tide check valve supplied by Council and associated temporary works and reinstatement within a coastal environment. •Nayland Street Manhole 16498: Upgrading of an existing stormwater manhole, including replacement of the manhole lid with new trafficable access covers, structural upgrades to the manhole, installation of new stormwater sump and connections, reinstatement, and traffic management.

Paskelbta

14.05.2026

Sutartis suteikta

14.05.2026

Otnox

Raskite pirkimus, kuriuose verta dalyvauti.

Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.

  • Pirkimo dokumentaiPeržiūrėkite turimus failus vienoje darbo aplinkoje.
  • Reikalavimai ir rizikosUžsakykite dokumentų analizę su nuorodomis į šaltinius.
  • Jūsų pirkimų atrankaTęskite su pasirinktomis rinkomis ir veiklos sritimis.