The Hokitika swimming pool currently has a diesel boiler heating the pool water temperature, and electrical heaters for space heaters. We are looking to replace the diesel boiler to lower operational costs from the diesel boiler, and improve the space heating to provide a better environment within the swimming pool concourse • Electrical main board upgrade and power supply to new heating systems • Design & build new platform and enclosure, with acoustic screening and access. Strengthening of existing plantroom enclosure • Supply and install new AHU and heat pump and connect into existing plantroom
Paskelbta
06.05.2026
Sutartis suteikta
06.05.2026
Livingstone Street Stormwater Renewal
Uždaryta·Jul 23
18-19-08 Arahura Water Treatment Plant
Sutartis suteikta·Apr 17
South Westland Solid Waste and Recycling Services
Sutartis suteikta·Mar 26
Ross Swimming Pool Renovation 25-26-06
Sutartis suteikta·Mar 26
Haast Watermains Upgrade
Sutartis suteikta·Nov 27
WCWT New Totara River Bridge RFP
Sutartis suteikta·Nov 27
Lake Terrace Water Treatment Plant Seismic Strengthening
Priima pasiūlymus·Oct 25
Wastewater Network Pipe Rehabilitation 2627
Priima pasiūlymus·Oct 23
Advance Notice - Coronial Support Services Procurement
Priima pasiūlymus·Oct 23
UCOL Block 1 West & Block 3 Seismic Strengthening Project
Priima pasiūlymus·Oct 23
Contract 26/77 - Railway Drain Stormwater Treatment - Request for Tender – Advertising Notice
Priima pasiūlymus·Oct 23
14622 - Brigham Creek Roundabout Improvements Detailed Design (RFT)
Priima pasiūlymus·Oct 23
Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.