This Contract is a measure and value contract for the following area: • HAAST – The installation of approximately 250m of 125mm Blue PE 100 SDR11 Watermains pipe and associated fittings and connections. • HAAST – The installation of approximately 190m of 63 mm Blue MDPE Medium Density PE Water Main Pipe, associated fittings and connections.
Terminas
10.03.2025
Paskelbta
27.11.2025
Sutartis suteikta
27.11.2025
Livingstone Street Stormwater Renewal
Uždaryta·Jul 23
Hokitika Pool Heating System Upgrade
Sutartis suteikta·May 6
18-19-08 Arahura Water Treatment Plant
Sutartis suteikta·Apr 17
South Westland Solid Waste and Recycling Services
Sutartis suteikta·Mar 26
Ross Swimming Pool Renovation 25-26-06
Sutartis suteikta·Mar 26
WCWT New Totara River Bridge RFP
Sutartis suteikta·Nov 27
Ohourere Water Treatment Plant - Electrical and Process Upgrade
Priima pasiūlymus·Oct 29
Lake Terrace Water Treatment Plant Seismic Strengthening
Priima pasiūlymus·Oct 25
Water and Wastewater Assets Valuation
Priima pasiūlymus·Oct 23
PNCC - 26_047 - Milson Line Water Reservoir Design and Build
Priima pasiūlymus·Oct 18
Water Mains Resilience Phase Three
Priima pasiūlymus·Oct 18
RIV_2600611 Rangitata/Rakitata River Flood Resilience – Groyne Rockwork Reinstatement
Priima pasiūlymus·Oct 18
PNCC - Waste Water Treatment Plant Seismic Strengthening
Priima pasiūlymus·Oct 30
Grow Manukau Health Park - Electronic Wayfinding and Pathfinding Solution
Priima pasiūlymus·Oct 30
Total Mobility and wider PT Assurance
Priima pasiūlymus·Oct 30
New Care Response for Taranaki Manawatū
Priima pasiūlymus·Oct 30
National Parking Equipment Replacement Programme
Priima pasiūlymus·Oct 30
Contract 26_08 Hastings Road Pavement Rehabilitation
Priima pasiūlymus·Oct 30
Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.