NC2A is the North Chilterns to Aylesbury section of C23, a part of the HS2 project managed by the EKFB Joint Venture. We are seeking a specialist subcontractor to undertake the following highway works within the NC2A section: A41 Bicester Road East: tie-in and demolition of temporary works Waddesdon and Quainton: Highways and drainage works Putlowes Farm: Highways, including the Putlowes watercourse diversion Please express your interest within this package.
Paskelbta
28.04.2026
Aktīvs
28.04.2026
Terminas
05.05.2026
EKFB JV - NC2A WGT Portal Buildings Blockwork package
Uždaryta·Sep 16
EKFB JV - G2S - Central - Stair & Hard Landscaping Trial / Works
Uždaryta·Sep 15
EKFB JV - As - Built Surveys
Uždaryta·Aug 27
EKFB JV - Waste Management Services
Uždaryta·Aug 26
EKFB - Welfare Equipment (Additional Mobile Welfare Accommodation Resource) - Opportunity
Uždaryta·Jul 31
EKFB JV - Precast Concrete UTX (Under Track Crossing) chambers system and adjoining duct works
Uždaryta·Jun 23
Reconstruction of Smorthwaite Retaining Wall
Sutartis suteikta·Sep 16
A639 Thwaites Gate to M1 Junct 44
Sutartis suteikta·Aug 20
A61 Jumbles Lane - Carlton Lane
Sutartis suteikta·Jul 24
EKFB JV - Highways Works NC2A
Uždaryta·May 29
A66 - Scheme 3A - Penrith to Temple Sowerby - Compound Construction
Uždaryta·May 12
A66 - Scheme 3A - Penrith to Temple Sowerby - Compound Construction
Uždaryta·May 12
CBC-1682-FA-LS-FC-58-ZH 35 Upper Shelton - AWARD
Sutartis suteikta·Oct 24
Framework for Call-down Technical Assistance - Engineering and Climate-Resilient Infrastructure Advisory Services (BRAVE-IS)
Priima pasiūlymus·Oct 23
Interim Deputy CDIO
Sutartis suteikta·Oct 23
DPS1 1438 - Fell Trees
Priima pasiūlymus·Oct 23
Pi Drive 2 Plus Motor
Sutartis suteikta·Oct 23
WSFT - Capital - New Hospital Programme
Sutartis suteikta·Oct 23
Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.