EKFB JV seek EOI's from interested parties with the appropriate experience and resources for the supply of Welfare Equipment (inclusive of Mobile Welfare Accommodation, Welfare Vans, Portable Toilets) to support the delivery of our C23 HS2 project. The 3 areas for delivery are North Chilterns Area and Aylesbury Area (NC2A), Calvert to Greatworth (C2G) and Greatworth to Southam (G2S). EKFB JV is proud to have been appointed by HS2 to deliver civil engineering works across an 80km section of the new high speed rail link between the Chiltern Tunnel and Long Itchington Wood. Our scope of the works includes 15 viaducts, 6.9km of green tunnels, 22km of road diversions, 81 bridges and around 30 million cubic metres of excavation. EKFB JV may look to award multiple agreements to suit geographical capability dependent on the response to this EOI, in support of SME's and Local Businesses.
Paskelbta
31.07.2026
Priima pasiūlymus
31.07.2026
Terminas
12.08.2026
EKFB JV - NC2A WGT Portal Buildings Blockwork package
Uždaryta·Sep 16
EKFB JV - G2S - Central - Stair & Hard Landscaping Trial / Works
Uždaryta·Sep 15
EKFB JV - As - Built Surveys
Uždaryta·Aug 27
EKFB JV - Waste Management Services
Uždaryta·Aug 26
EKFB JV - Precast Concrete UTX (Under Track Crossing) chambers system and adjoining duct works
Uždaryta·Jun 23
EKFB JV - NC2A Footway and Accommodation Overbridges FRC works
Uždaryta·Jun 11
Buckley Barracks SLA - RIBA Stage 3-4
Sutartis suteikta·Sep 30
Claremont Redevelopment - Kingsweston Temporary Classrooms - Installation & Lease
Sutartis suteikta·Sep 25
Milford Infants Modular Hall
Sutartis suteikta·Sep 24
Provision of Close Quarter Combat systems - RFI/PME
Uždaryta·Sep 22
Equipment Support Tactical Workshop
Uždaryta·Sep 18
Tinsley Golf Course Temporary Facility
Sutartis suteikta·Aug 17
Framework for Call-down Technical Assistance - Engineering and Climate-Resilient Infrastructure Advisory Services (BRAVE-IS)
Priima pasiūlymus·Oct 23
Interim Deputy CDIO
Sutartis suteikta·Oct 23
DPS1 1438 - Fell Trees
Priima pasiūlymus·Oct 23
Pi Drive 2 Plus Motor
Sutartis suteikta·Oct 23
WSFT - Capital - New Hospital Programme
Sutartis suteikta·Oct 23
Homes England - Service Now & Operating Model Assessment
Sutartis suteikta·Oct 23
Susikurkite paskyrą, kad galėtumėte išnagrinėti šį pirkimą ir rasti panašių galimybių.