Otnox
NZNuova Zelanda·Stazione appaltante: Westland District Council

WCWT New Totara River Bridge RFP

Aggiudicata·27 nov 2025

A.1.2 Invitation to Submit Proposal On behalf of the Principal, we are inviting proposals to design and construct the works of the above-named Contract. The Contract Works include design and construction of a new Totara River Suspension Bridge for use by cyclists and pedestrians, and a light maintenance vehicle, and are described in more detail below. Proposals for the Contract must be prepared and submitted in accordance with the conditions of proposals in A.2. A valid proposal requires the submission of the items in the checklist in B.1 signed where indicated by an authorised representative of the proposer.

Scadenza

17.10.2025

Pubblicazione

27.11.2025

Aggiudicata

27.11.2025

Otnox

Trova gare a cui vale la pena partecipare.

Crei un account per approfondire questa gara e trovare opportunità simili.

  • Documenti di garaConsulta i file disponibili in un unico spazio di lavoro.
  • Requisiti e rischiRichiedi un’analisi dei documenti con riferimenti alle fonti.
  • La tua selezione di gareProsegui con i mercati e i settori selezionati.