The Hokitika swimming pool currently has a diesel boiler heating the pool water temperature, and electrical heaters for space heaters. We are looking to replace the diesel boiler to lower operational costs from the diesel boiler, and improve the space heating to provide a better environment within the swimming pool concourse • Electrical main board upgrade and power supply to new heating systems • Design & build new platform and enclosure, with acoustic screening and access. Strengthening of existing plantroom enclosure • Supply and install new AHU and heat pump and connect into existing plantroom
Pubblicazione
06.05.2026
Aggiudicata
06.05.2026
Livingstone Street Stormwater Renewal
Chiusa·Jul 23
18-19-08 Arahura Water Treatment Plant
Aggiudicata·Apr 17
South Westland Solid Waste and Recycling Services
Aggiudicata·Mar 26
Ross Swimming Pool Renovation 25-26-06
Aggiudicata·Mar 26
Haast Watermains Upgrade
Aggiudicata·Nov 27
WCWT New Totara River Bridge RFP
Aggiudicata·Nov 27
Seatoun Tunnel Repainting
Aperta alle offerte·Nov 4
130-140 Grafton Rd Retaining Wall Construction
Aperta alle offerte·Nov 4
RFP Security Fencing OTRFP2026_649
Aperta alle offerte·Nov 3
ROI - Drainage Contractor for Kaipara College - Site: Drainage Remediation
Aperta alle offerte·Nov 3
Main Contractor for the Site: Carpark, Footpaths and Bus Shelter at Northcross Intermediate School
Aperta alle offerte·Nov 3
Main Contractor for the Blocks 2, 11: Re-aligning classroom walls, Removal of ACM cladding, and Classroom Refurbishment at Northcross Intermediate School
Aperta alle offerte·Nov 3
Crei un account per approfondire questa gara e trovare opportunità simili.