*Marine construction services
Publié
09.09.2026
Ouvert aux offres
09.09.2026
Date limite
24.09.2026
Erosion protection work at the Chilliwack Hatchery, British Columbia for Fisheries and Oceans Canada (DFO)
Analysis of the Beluga Fattening Cycle using photogrammetry
3 Propane Engine Forklifts - Hatcheries
Imaging of Southern Nova Scotia coastline using ShoreZone methodologies
RFSO -Coastal imaging, habitat classification, shoreline assessment in Canada
Float Replacement - Gimli, MB
Erosion protection work at the Chilliwack Hatchery, British Columbia for Fisheries and Oceans Canada (DFO)
F521A-250010 - Phase 1 - Oona River Dredging
Float Replacement - Gimli, MB
Structure 401 Timber Pile Repairs - Head Harbour, Campobello Island, NB
Maintenance dredging with floating equipment at Baie-Comeau, QC
Wood Islands Containment Cell, Wood Islands, PEI
© 2026 SIA «Vietne». Tous droits réservés.