*Marine construction services
Publié
11.09.2026
Ouvert aux offres
11.09.2026
Date limite
21.09.2026
Analysis of the Beluga Fattening Cycle using photogrammetry
3 Propane Engine Forklifts - Hatcheries
Imaging of Southern Nova Scotia coastline using ShoreZone methodologies
Wharf Repairs, Port au Choix, Newfoundland and Labrador
RFSO -Coastal imaging, habitat classification, shoreline assessment in Canada
Float Replacement - Gimli, MB
Wharf Repairs, Port au Choix, Newfoundland and Labrador
F521A-250010 - Phase 1 - Oona River Dredging
Float Replacement - Gimli, MB
Structure 401 Timber Pile Repairs - Head Harbour, Campobello Island, NB
Maintenance dredging with floating equipment at Baie-Comeau, QC
Wood Islands Containment Cell, Wood Islands, PEI
Request for Information (RFI) Live Television News Feed Service Delivery
Multi-Tier IM/IT Research and Advisory Services
Vanderhoof Detachment Reception Ballistic Upgrades
Saint-Ours Dam Drainage System Modernization, Saint-Ours Canal National Historic Site
Multiple Resource Categories
NPP – W3372-275169/A – TSPS SA – One (1) Senior Information/Records Management/Recordkeeping Specialist
© 2026 SIA «Vietne». Tous droits réservés.