The project consists of design, construction, supply, installation and reinstatement works and siteworks which includes but are not limited to: • Development of the design documentation and building consent application. • Submission and management of building consent. • Demolition of the existing toilet, including debris removal and disposal to an approved dump site, and reinstatement of affected surrounding areas. • Supply, install and delivery of a new two pan turnkey concrete toilet block. • Installation of new power, water through new water tank, sewer and stormwater service connections. • Level the ground beside the toilet and extend the stormwater manhole riser to match. Add a drainage opening in the riser for playground runoff and fit a dome grate over the manhole inlet.
Publié
03.09.2026
Ouvert aux offres
03.09.2026
Date limite
09.10.2026
Future ERP - System Integrator, Business Integrator, and Quality Assurance
Pākihikura (Opotiki) Harbour Dredging Contract - EOI
CWTP Belt Press Polymer Plant
Te Nukutai o Tapoa Naval Point Lyttelton Recreation Ground Sports Field Lighting
ICT Services Solution for Rolleston College
Meeting Room Modernisation RFP
© 2026 SIA «Vietne». Tous droits réservés.