The project consists of design, construction, supply, installation and reinstatement works and siteworks which includes but are not limited to: • development of the design documentation, building and resource consent application • submission and management of building & resource consent • supply, install and delivery of a new two pan turnkey toilet block • installation of a new water bore, pump, a housing and water supply treatment for the toilet • installation of new power, water through new water bore, sewer and stormwater service connections
Publié
11.09.2026
Ouvert aux offres
11.09.2026
Date limite
09.10.2026
ROI - Otara Wastewater Network Upgrade Design Services
Suppliers of Independent Asset Management Reviews
RFT - Main Contractor for Design, Supply, & Installation of a Covered Outdoor Learning Canopy at Waimea Intermediate School, Nelson
High Tech Imaging Services
Elective Surgery Services
Registration of Interest - Main Contractor - Block 6 Cladding Replacement - Thorrington School
© 2026 SIA «Vietne». Tous droits réservés.