The works are required to ensure a safe fire escape route for staff and the public and involve the installation of a protective ceiling system beneath an existing suspended ceiling. The solution includes the installation of a structural timber framework and plywood barrier designed to contain falling debris and maintain safe access and headroom. All works will be carried out in accordance with the Control of Asbestos Regulations 2012 and relevant health and safety legislation. The works include site preparation, installation, sealing to prevent dust migration, and full clean-up. This requirement has been identified as urgent due to health and safety risks associated with the existing conditions, and immediate action is required to ensure compliance and safe operation of the facility.
Date limite
14.08.2026
Publié
02.09.2026
Attribué
02.09.2026
Clerk of Works (Fire Alarm Replacement Scheme)
Attribué·Oct 12
Dirty Utility Works GRH Tower Block
Attribué·Sep 8
King Builders Various Minor Works Projects
Attribué·Aug 19
Women's Centre Fire Door Mag Lock Works
Attribué·Aug 18
Project Management Support _ Provelio
Attribué·Aug 17
CGH BMS Upgrade Project 2026/2027
Attribué·Aug 6
2026-10-28 09:00 - QSB467 Ipswich to Pushforward Secondary (various locations in Ipswich, Stowmarket & Bury St Edmunds) - AWARD
Attribué·Oct 31
March 2027 Bus Contracts
Attribué·Oct 31
Infrastructure Connection Design Support - Pathology Lab
Attribué·Oct 30
Provision of Pre-Paid Cards
Attribué·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Attribué·Oct 30
Business Travel Services
Attribué·Oct 30
Créez un compte pour étudier cet appel d’offres et trouver des opportunités similaires.