The works comprise a replacement fire alarm installation throughout the hospital. The works have been split into 26 seperate packages of work (plus main Network Loop) and are managed via a JCT Design and Build framework contract agreement. The scope covers retrospective inspection & snagging/de-snagging of the executed fire alarm packages. Works are delivered in a live hospital environment. The works have been split into 26 separate packages of work (plus main network loop) and are managed via a JCT Design and Build framework contract agreement.
Date limite
31.07.2026
Publié
12.10.2026
Attribué
12.10.2026
Dirty Utility Works GRH Tower Block
Attribué·Sep 8
Provision of Emergency Asbestos-related works
Attribué·Sep 2
King Builders Various Minor Works Projects
Attribué·Aug 19
Women's Centre Fire Door Mag Lock Works
Attribué·Aug 18
Project Management Support _ Provelio
Attribué·Aug 17
CGH BMS Upgrade Project 2026/2027
Attribué·Aug 6
Fire Alarm Service and Maintenance
Attribué·Oct 13
Colindale Fire Safety Survey
Attribué·Sep 18
HMP Wayland Fire Safety Improvement Works
Attribué·Aug 10
NUNCON - Lifeline Call Monitoring Service
Attribué·Jul 8
Fire Alarm Systems Maintenance
Attribué·Mar 16
Fire Alarm Maintenance
Attribué·Mar 11
2026-10-28 09:00 - QSB467 Ipswich to Pushforward Secondary (various locations in Ipswich, Stowmarket & Bury St Edmunds) - AWARD
Attribué·Oct 31
March 2027 Bus Contracts
Attribué·Oct 31
Infrastructure Connection Design Support - Pathology Lab
Attribué·Oct 30
Provision of Pre-Paid Cards
Attribué·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Attribué·Oct 30
Business Travel Services
Attribué·Oct 30
Créez un compte pour étudier cet appel d’offres et trouver des opportunités similaires.