The Hokitika swimming pool currently has a diesel boiler heating the pool water temperature, and electrical heaters for space heaters. We are looking to replace the diesel boiler to lower operational costs from the diesel boiler, and improve the space heating to provide a better environment within the swimming pool concourse • Electrical main board upgrade and power supply to new heating systems • Design & build new platform and enclosure, with acoustic screening and access. Strengthening of existing plantroom enclosure • Supply and install new AHU and heat pump and connect into existing plantroom
Publié
06.05.2026
Attribué
06.05.2026
Livingstone Street Stormwater Renewal
Clôturé·Jul 23
18-19-08 Arahura Water Treatment Plant
Attribué·Apr 17
South Westland Solid Waste and Recycling Services
Attribué·Mar 26
Ross Swimming Pool Renovation 25-26-06
Attribué·Mar 26
Haast Watermains Upgrade
Attribué·Nov 27
WCWT New Totara River Bridge RFP
Attribué·Nov 27
Main Contractor for Block E (Music Suite) Roof & Wall Recladding at Maruawai College
Ouvert aux offres·Nov 1
Main Contractor for Roofing Refurbishment at Avalon School (Wellington)
Ouvert aux offres·Nov 1
Notice of Information - Napier City Council Tender Dates Over Holiday Season
Ouvert aux offres·Nov 1
Howick Fire Station
Ouvert aux offres·Nov 1
SCI_2600812 High Stage Rating Curve Modelling
Ouvert aux offres·Nov 1
Kelburn Viaduct Safety Screens
Ouvert aux offres·Nov 1
Créez un compte pour étudier cet appel d’offres et trouver des opportunités similaires.